Quick answer: ALHUD delivers commercial fit-out across Abu Dhabi for offices, clinics, salons, cafes, showrooms and retail units — demolition and strip-out, partitions, gypsum ceilings, electrical and data, HVAC modifications, plumbing, flooring, joinery, signage coordination and finishes. Most fit-outs run three to eight weeks. Landlord NOCs and authority submissions are handled as part of the project.

Approvals first

Fit-out Delays Are Almost Always Paperwork

A commercial fit-out in Abu Dhabi rarely runs late because of the building work. It runs late because drawings sat with the landlord for three weeks, or because a civil defence requirement surfaced after the ceiling had already gone in.

ALHUD front-loads that. Landlord technical requirements, building management NOCs and authority submissions are identified at survey stage and started before mobilisation, so approvals run in parallel with procurement instead of stopping the site.

  • Landlord technical guidelines reviewed before design is fixed
  • Building management NOC preparation and submission
  • Authority and civil defence coordination where required
  • Contractor insurance and licence documentation supplied
  • Works phased around trading hours where a unit stays open
  • Handover pack with as-built information and warranties
ALHUD team reviewing commercial fit-out drawings on an Abu Dhabi site
Sectors

Commercial Spaces We Fit Out

Each sector brings its own compliance and layout demands.

Offices

Open plan and cellular layouts, glass and gypsum partitions, meeting rooms, pantries, reception counters and data cabling.

Clinics & medical

Layouts and finishes built around hygiene and health authority requirements, with correct drainage and ventilation.

Salons & spas

Wet stations, plumbing and drainage for wash units, ventilation, mirrors, joinery and lighting designed for skin tones.

Cafes & restaurants

Kitchen services, extraction, grease management, wet areas, seating joinery and durable front-of-house finishes.

Retail & showrooms

Display joinery, feature lighting, flooring specified for footfall and shopfront coordination with signage suppliers.

Warehouses & workshops

Mussafah and industrial unit fit-outs — office pods, mezzanine finishing, lighting and power distribution.

Programme

Typical Fit-out Timeline

Indicative for a mid-sized unit. Confirmed with your quote.

StageWorkDuration
Survey & designMeasured survey, layout drawings, specification1–2 weeks
ApprovalsLandlord NOC, authority submissions1–3 weeks
Strip-outDemolition, removals, making safe3–5 days
First fixPartitions, electrical, data, HVAC, plumbing1–2 weeks
Ceilings & finishesGypsum, flooring, paint, glazing1–2 weeks
Joinery & handoverCounters, storage, snagging, cleaning1 week
Common questions

Office & Commercial Fit-out Questions, Answered

How much does an office fit-out cost in Abu Dhabi?

Commercial fit-out is priced per square metre after survey, because the range is wide — a basic partition-and-paint refresh sits far below a clinic with specialist drainage and ventilation. ALHUD provides a fixed itemised quote after measuring the unit.

Can you work outside business hours?

Yes. Occupied offices, retail units and cafes are commonly fitted out in evenings and on weekends so trading continues. Night works need building management approval, which ALHUD arranges as part of the programme.

Do you provide the design and drawings?

ALHUD produces layout and services drawings suitable for landlord and authority submission. Where a project needs a full design concept or specialist consultant, that is arranged and coordinated alongside the build.

Who handles the landlord NOC?

ALHUD does. The submission pack, insurance, licence copies and method statements are prepared and lodged before mobilisation, which is the single most common cause of delay when a tenant tries to manage it themselves.

Completed villa renovation in Abu Dhabi with garden and pool view

Fitting Out a Commercial Space?

Send the unit size, location and what the space needs to do. A survey and fixed quote follow within 48 hours.

Call Now WhatsApp