Re-tiling & mosaic
Full re-tile or waterline band replacement using pool-grade tile and epoxy grout that survives chemical dosing.
Re-tiling, structural crack repair, waterproofing, filtration and pump upgrades, lighting and deck resurfacing for villa and compound pools across the emirate.

Quick answer: ALHUD renovates villa and compound swimming pools across Abu Dhabi — drain-down and inspection, structural crack repair, waterproof tanking, full re-tiling or mosaic replacement, coping and edge detail, filtration and pump replacement, plumbing and balance tank works, underwater lighting, and deck and surround resurfacing. Most pool renovations run three to six weeks.

Every pool owner who calls describes the same symptom: the level keeps dropping. The cause is one of three things, and they need completely different work.
Evaporation is normal here and is not a fault — an uncovered pool in an Abu Dhabi summer loses a surprising amount without anything being wrong. A structural leak shows as loss that continues with the pump off. A plumbing leak shows as loss that only appears when the pump runs. ALHUD isolates which one you have before quoting anything, because re-tiling a pool that has a leaking return line is money spent on the wrong problem.
Shell, services and surround.
Full re-tile or waterline band replacement using pool-grade tile and epoxy grout that survives chemical dosing.
Structural cracks routed and repaired, then the shell tanked before any finish goes back on.
Sand and cartridge filter replacement, pump upgrades, pipework renewal and energy-efficient variable-speed options.
Underwater LED replacement, colour-change systems and surround lighting, with correct sealing and isolation.
Coping stone replacement, anti-slip deck tiling, timber-effect decking and drainage channel correction.
Handrails, ladders, safety fencing, covers, heat pumps and chemical dosing equipment.
Weather and curing times drive the programme more than labour does.
| Scope | Work | Duration |
|---|---|---|
| Waterline re-tile | Partial drain, band replacement, grout | 5–8 days |
| Full re-tile | Drain, strip, tank, tile, grout, refill | 2–4 weeks |
| Crack & structural repair | Route, repair, tank, test | 1–2 weeks |
| Filtration replacement | Pump, filter, pipework, commissioning | 3–5 days |
| Full renovation | Shell, tiling, services, coping, deck | 3–6 weeks |
A bucket test separates them: float a bucket of pool water on a step and compare the drop inside and outside over 24 hours. Equal drop is evaporation. If the pool drops faster, ALHUD will test with the pump on and off to locate the source.
For a full re-tile, two to four weeks. An empty pool should not be left standing indefinitely in this climate — ground water and heat both act on an empty shell — so the programme is planned to refill as soon as curing allows.
Yes. Chlorinator installation, compatible fittings and pipework changes are quoted together. It is worth doing during a renovation while the pool is already drained and the plant room is accessible.
Yes, under an annual maintenance contract covering water balance, cleaning, filter servicing and equipment checks. Details are on the maintenance contracts page.
Book a free pool survey. ALHUD will isolate the cause before quoting, so you pay to fix the right thing.